Documentation

Implementation and operating guidance for EL-Ai-NE.

One document set for Baseline v1.0.0: decide with the Design Guide, specify with the Bill of Materials, and build with the Implementation Guides. Customer documents are supplied as publication PDFs.

Baseline v1.0.0 document set

One set of documents, from first read to day-two operation.

Every document describes EL-Ai-NE as designed in Baseline v1.0.0 and labels each capability as available now, enabled per qualification or planned. Customer documents are supplied as publication PDFs.

Start here

Public Architecture Guide

System ownership, Structured Decision Intelligence, governed workspaces, traffic classes, deployment preparation, continuity and qualification.

Available on request.

Request the Architecture Guide
Decide

Design Guide

The value, how it works, twelve use cases, where your data lives, the design choices for each rollout track, plans and licensing, and how EL-Ai-NE fits beside the products you already own.

Available on request.

Request the Design Guide
Specify

Bill of Materials

Minimum and recommended specifications with example hardware for the lab, the pilot, every site class and every cell, plus network, power, rack, software and spares. Includes a planning workbook.

Available on request.

Request the Bill of Materials
Build a proof

Implementation Guide: POC and Pilot

Step-by-step procedures to build the reference lab, install and verify the platform, run the thirty-day proof of concept and activate a first pilot site.

Supplied with an evaluation or a pilot.

Ask about an evaluation
Go live

Implementation Guide: Production

Day 0 planning, Day 1 installation and qualification, cohort rollout and Day 2 operation, with runbooks and acceptance scenarios.

Supplied with a production engagement.

Plan a production rollout
Design in depth

High-Level and Low-Level Designs

The deployment architecture for all three tracks, and the detailed designs for the lab and pilot and for the production estate.

Shared with customers and partners during a design engagement.

Request a design discussion

The Baseline v1.0.0 document set replaces earlier installation, network, operating, pricing, industry and content guides. Where an earlier document and the baseline differ, the baseline governs. Production installation uses the qualified release package and approved environment values.

AI Governance Center

Understand the governance lifecycle before selecting an implementation profile.

The public Governance and Assurance pages explain inventory, impact assessment, human oversight, third-party governance, transparency, post-market monitoring, redress, framework evidence, audit, and release gating.

Public architecture page

AI Governance

See how organizational governance records connect to identity, policy, workflows, actions, monitoring, and evidence.

Public assurance page

Assurance and Evidence

Explore the evidence bundle, qualification profiles, framework crosswalks, monitoring, redress, audit, and governance metrics.

From concept to operation

Assess, design, activate, operate, and optimize.

Each phase preserves architecture truth, named ownership, deployment evidence, rollback, and measurable acceptance criteria.

AssessOutcome, data, risk, topology, and readiness.
DesignUse case, authority, network, capacity, and test plan.
ActivateInstall, integrate, enroll, validate, and accept.
OperateMonitor, support, recover, change, and report.
OptimizeImprove quality, cost, capacity, and outcomes through governed release.
Ask EL-Ai-NEPublic website guide
Ask about capabilities, governance, privacy, Brain Trust, risk, deployment, pricing, comparisons, or public resources.